A gigawatt (GW) is a unit of power equal to one billion watts, or 1,000 megawatts. In AI, it has become the standard way to say how big a data center, a power deal or a build-out plan is.
Power is a rate, not a total
Watts measure how fast electricity is used at a moment. Energy is power over time, measured in watt-hours. A facility rated at one gigawatt can draw up to a billion watts at any instant. Over a full year of nonstop use, it would consume roughly 8.76 terawatt-hours.
Think of a faucet. The gigawatt rating is how wide the faucet can open. The watt-hours are how much water ends up in the bucket.
What a gigawatt looks like
A common rule of thumb is that one gigawatt of continuous supply serves roughly 700,000 to 750,000 average US homes. The exact figure moves with assumptions about how hard the site runs, so treat it as an estimate. It is also often compared to the output of a single large nuclear reactor.
Early data centers were sized in tens of megawatts. Plans for AI campuses are now announced in gigawatts, because training and serving large models takes enormous numbers of GPUs, and each one draws hundreds of watts before cooling is counted.
Why AI people care
Chips are no longer the only limit. Getting a gigawatt of power connected can take years, because it needs generation, transmission lines and permits. That is why labs now talk about power the way they talk about compute: as a scarce input they have to secure ahead of time.
When a company says it has contracted "1.7 gigawatts" of anything, it is describing peak capacity, not a finished data center. Equipment still has to be installed, connected and filled with hardware.
How to read a gigawatt claim
Ask three questions. Is it capacity or actual consumption? Is it built, under construction or only planned? And is it power the company generates itself or buys from the grid? The answers change what the number means for inference capacity you can actually use.
A gigawatt describes the size of an AI data center and its appetite for electricity. How much of that power turns into useful AI work depends on the chips, the cooling and the software. Capacity announcements are plans, and plans lag the hardware by months or years.